Ormond Beach FEMA Flood Map Update (2025–2026), Explained
If you searched "Ormond Beach flood FEMA 2025 2026," here is the actual answer, with dates and primary sources — because most of what ranks for this is marketing fog. FEMA issued preliminary new flood maps for all of Volusia County on May 29, 2025. They are not in effect yet, the 90-day appeal and comment period is open right now — it started August 20, 2026 and runs to about November 18, 2026 — and, the part that matters if you own or are buying in Ormond Beach, neither the City of Ormond Beach nor Ormond-by-the-Sea is being remapped. I verified that directly against FEMA's preliminary map database, address by address: the remapping covers the St. Johns River side of the county, roughly 20 miles west of the beach.
On August 20, 2026, FEMA opened a 90-day appeal and comment period on the proposed Volusia County flood maps, per Volusia County's own announcement. It runs through roughly November 18, 2026.
Why this page used to say the window closed April 21, 2026. That date was 90 days after the Federal Register notice — but that is not the clock FEMA actually uses. Under 44 CFR 67.4, the statutory 90-day appeal period begins upon the second publication of the notice in a local newspaper, not on the Federal Register date. That local publication happened in August 2026. I have corrected the timeline below.
This is the same study, not a second one. I checked every "Proposed Flood Hazard Determinations" notice published in the Federal Register from July 1 through September 1, 2026 (documents 2026-13901, 2026-15938, 2026-15939, 2026-15943, 2026-17074, 2026-17075 and 2026-17076) — none of them list Volusia County. The governing notice is still the January 21, 2026 one, Docket FEMA-B-2578.
- May 29, 2025 — FEMA issued preliminary Flood Insurance Rate Maps for the whole county (Project 20-04-0049S, a St. Johns River watershed restudy spanning six counties).
- January 21, 2026 — the Federal Register notice (Docket FEMA-B-2578) published FEMA's proposed flood hazard determinations for Volusia.
- August 20, 2026 — the 90-day appeal and comment period opened, and is open now through about November 18, 2026. Appeals go through your community, not directly to FEMA: unincorporated Volusia owners submit to the county ([email protected]); inside a city, submit to that city.
- Proposed changes in Volusia touch: Daytona Beach, DeLand, Pierson, and unincorporated west Volusia (the St. Johns River side — DeLeon Springs, the Lake George corridor). Verified against the preliminary map database: no Ormond Beach or Ormond-by-the-Sea panels are remapped — the new flood-zone data ends near the I-95/SR-415 corridor.
- Today's legal maps are still the old ones (2014 core, 2017 major revision, 2018 panel updates). Expect the new maps to become effective in 2027 after FEMA's final determination plus the ~6-month adoption period.
- A zone change doesn't reset your premium under Risk Rating 2.0 — but it does switch the lender mandatory-purchase requirement on or off.
The timeline, with sources
| Date | What happened | Status |
|---|---|---|
| Feb 19, 2014 | Current countywide FIRM base becomes effective | In effect today |
| Sep 29, 2017 | Major revision — significant portions of the county's maps updated | In effect today |
| Aug 7, 2018 | Four panels revised | In effect today |
| May 29, 2025 | FEMA issues preliminary FIRMs for all of Volusia County (Project 20-04-0049S — St. Johns River watershed restudy covering Bradford, Clay, Duval, Flagler, Putnam and Volusia counties) | Review only — cannot be used to rate insurance or trigger lender rules |
| Jan 21, 2026 | Federal Register "Proposed Flood Hazard Determinations" notice (Docket FEMA-B-2578) — lists City of Daytona Beach, City of DeLand, Town of Pierson, unincorporated Volusia County | Published |
| Aug 20, 2026 | 90-day appeal & comment period opens (the clock runs from second local newspaper publication, per 44 CFR 67.4 — not from the Federal Register date) | Open now |
| ~Nov 18, 2026 | Appeal & comment period closes — 90 days from Aug 20. Confirm the exact date with your community before relying on it | Deadline |
| Next | FEMA resolves appeals → Letter of Final Determination → ~6-month community adoption period → new maps effective | Realistically 2027 — no date set yet |
What actually changes for Ormond Beach
The January 2026 Federal Register notice names the specific Volusia communities where FEMA proposes base flood elevation, flood zone, or floodway changes: the City of Daytona Beach, the City of DeLand, the Town of Pierson, and unincorporated Volusia County. The City of Ormond Beach is not in that table — meaning FEMA is not proposing zone or elevation changes inside the city limits in this study round.
Before you exhale, three catches:
1. "Unincorporated Volusia County" on that list does not mean Ormond-by-the-Sea. Because Ormond-by-the-Sea is unincorporated, the county's appearance on FEMA's list reads like it could be in scope. So I checked, directly: I downloaded FEMA's preliminary FIRM database for the study (dataset 12127C, issued May 29, 2025) and ran Ormond-by-the-Sea addresses against it — oceanfront on Ocean Shore Blvd, riverside on John Anderson Dr, and interior streets. None of them fall inside the preliminary study area. The new flood-zone data covers only the northwest, St. Johns River portion of the county and stops near the I-95/SR-415 corridor. The unincorporated areas being remapped are places like DeLeon Springs and the Lake George corridor — not the barrier island. (Own property on that side of the county? The west Volusia version of this page has the measured changes for DeLand and Pierson.) Ormond-by-the-Sea's zones carry forward unchanged — and for the record, those zones are friendlier than the area's reputation: measured on the current maps, about 88% of Ormond-by-the-Sea is Zone X, with AE river pockets and VE along the oceanfront dune line.
2. Property-specific revisions keep happening regardless. Separate from the countywide restudy, FEMA processed multiple Letters of Map Revision (LOMRs) touching Ormond Beach in 2025–2026 — those are surgical, parcel-level map changes that show up in "Changes in Flood Hazard Determinations" notices. Your individual lot can change even when the city's maps don't.
3. The county is tightening the rules underneath the maps. Through 2025 Volusia County has been advancing floodplain-ordinance changes for unincorporated areas — including a proposed two feet of freeboard (build height above base flood elevation) for homes in repetitive-loss areas, floodways, storm-surge and sea-level-rise areas, plus 1:1 compensatory storage for fill. If you're building or substantially improving in Ormond-by-the-Sea, the construction rules may move before the maps do.
What it means if you own (or are buying) here
Owners inside city limits: nothing changes today. Your zone, your insurance, and your lender's requirements all still run off the 2014/2017/2018 maps, and no changes are proposed for the city in this round. The city's CRS Class 5 discount (25% off NFIP premiums in high-risk zones) is unaffected.
Owners in Ormond-by-the-Sea: same answer as the city — your zone carries forward unchanged in this round (verified against the preliminary database, see above). Your risk picture is still the one on the current maps: mostly Zone X by land area, AE in the river pockets, VE along the oceanfront dune line — and a dune system that's still being rebuilt. Owners in west Volusia (DeLand, DeLeon Springs, the Lake George corridor): you're the ones who should pull the preliminary map now. If it moves you into Zone A/AE, buying flood coverage before — or within 12 months of — the maps becoming effective preserves NFIP's newly-mapped phase-in pricing, and locking coverage while you're officially still in Zone X is the cheap way in. If it moves you out, your lender requirement could disappear when the maps go final — worth a calendar note, not a cancellation today.
Buyers: from now until the new maps go effective, every Ormond-area purchase should be checked against both maps — the current effective one (that's what your lender and insurer use at closing) and the preliminary one (that's the risk you'll own in 2027). A house that's Zone X today and AE on the preliminary map is priced like low-risk but will carry high-risk obligations. That two-map check is part of every KCAP report I run.
How to appeal or comment before the deadline (~November 18, 2026)
The window that opened August 20, 2026 is the one formal chance to challenge the proposed maps before FEMA finalizes them. Two different things go in it, and the distinction matters:
- An appeal challenges the proposed flood-hazard information itself — a base flood elevation, a zone boundary, a floodway. FEMA requires technical or scientific data supporting the change; an opinion that the map "looks wrong" is not an appeal. In practice that usually means an elevation certificate or a surveyor's or engineer's analysis.
- A comment covers everything that isn't a flood hazard — a misspelled road name, a wrong municipal boundary, a base-map error. No technical data required.
You submit through your community, not directly to FEMA. If your property is in unincorporated Volusia County, submissions go to the county — email [email protected] or mail the Thomas C. Kelly Administration Center — and must include the property owner's name, the full property address, and the specific feedback. If your property is inside a city's limits, you submit to that city instead; the county will not forward it for you.
For Ormond Beach and Ormond-by-the-Sea specifically: because no panels here are being remapped in this round, there is generally nothing to appeal — an appeal challenges a proposed change, and none is proposed for the barrier island. The deadline matters most to owners on the St. Johns River side of the county. That said, it costs ten minutes to confirm your own parcel against the preliminary portal below rather than take my word for it, and if you do find your address inside the study footprint, act before the window closes. A property-specific Letter of Map Amendment (LOMA) remains available year-round, deadline or not, if an elevation certificate shows your structure sits above the base flood elevation.
Check your address — official sources, free
• FEMA preliminary map portal — select Florida → Volusia County for the May 29, 2025 preliminary panels.
• FEMA Flood Map Service Center — the current effective map, for comparison.
• Volusia County flood maps & Flood Map Viewer — county GIS with parcels overlaid.
• City properties: the City of Ormond Beach Planning Department (386-610-0520) or its Forerunner floodplain tool.
Want the two-map check done for you — free?
Send me any Ormond Beach or Ormond-by-the-Sea address. I'll pull its current FEMA zone, its preliminary-map status, elevation, dune condition and a realistic insurance picture (CRS discount included) in one free KCAP report — before you're under contract, not after.
Get my free KCAP flood report →Ormond Beach FEMA flood map FAQ
Did FEMA change the Ormond Beach flood maps in 2025?
Not yet. FEMA issued preliminary maps for all of Volusia County on May 29, 2025 — review-only drafts that can't be used to rate insurance or trigger lender rules. The maps legally in effect are still the 2014/2017/2018 FIRMs.
When do the new maps take effect?
No date is set. The 90-day appeal and comment period opened August 20, 2026 and runs to about November 18, 2026. After it closes, FEMA resolves appeals, issues a Letter of Final Determination, and communities get ~6 months to adopt — realistically a 2027 effective date.
Is the FEMA flood map appeal period still open?
Yes. FEMA opened a 90-day appeal and comment period for the proposed Volusia County maps on August 20, 2026; it runs through roughly November 18, 2026. An earlier version of this page said the window closed April 21, 2026 — that was 90 days after the Federal Register notice, but FEMA's clock actually starts at the second local newspaper publication (44 CFR 67.4), which happened in August 2026.
Is my home's flood zone changing?
Almost certainly not in this round — for the city or Ormond-by-the-Sea. I checked addresses across the barrier island against FEMA's preliminary FIRM database directly: the study's new flood-zone data covers only the St. Johns River (northwest) side of the county and stops near I-95/SR-415. Parcel-level LOMRs still happen year-round, so an address-specific check is always worth a minute.
Will my insurance go up when the maps change?
Not automatically — Risk Rating 2.0 prices on property-specific risk, not the zone letter. But moving into A/AE/VE switches on the lender mandatory-purchase requirement, and buying before or within 12 months of the change preserves newly-mapped phase-in pricing.
Can I still appeal?
Yes — the formal window is open until about November 18, 2026. Submit through your community, not to FEMA directly: unincorporated Volusia goes to the county ([email protected]), city properties to that city. An appeal must include technical or scientific data; anything else counts as a comment. Separately, a property-specific Letter of Map Amendment (LOMA) is available any time, deadline or not, if an elevation certificate shows your structure sits above the base flood elevation.
Where do I see the preliminary maps?
hazards.fema.gov (preliminary portal, Florida → Volusia County), msc.fema.gov (current effective maps), or Volusia County's Flood Map Viewer. City properties can also call Ormond Beach Planning at 386-610-0520.
Related guides
West Volusia FEMA flood map update (the side that IS changing) · Ormond Beach flood zones & insurance cost (2026) · Volusia County cost guide & CRS table · Daytona Beach · Daytona Beach Shores · Port Orange · New Smyrna Beach · Ponce Inlet · Edgewater
Sources & methodology
- FEMA Preliminary Map Products portal — Volusia County, FL preliminary FIRM panels, issued 05/29/2025
- Federal Register, Jan 21, 2026 — Proposed Flood Hazard Determinations (Docket FEMA-B-2578; Project 20-04-0049S, Preliminary Date May 29, 2025; Volusia communities listed: Daytona Beach, DeLand, Pierson, unincorporated Volusia County). Note: the notice prints a comment date of April 21, 2026, but the statutory 90-day appeal period runs from second local newspaper publication — which Volusia County announced as August 20, 2026.
- Volusia County — Flood Maps & Elevation Certificates (current effective dates: Feb 19, 2014; Sep 29, 2017; Aug 7, 2018)
- Volusia County ENRAC, July 2, 2025 — proposed floodplain ordinance changes (2-ft freeboard options, 1:1 compensatory storage)
- FEMA — NFIP Risk Rating 2.0 pricing methodology
- FEMA Flood Map Service Center — current effective maps
- Volusia County — "FEMA opened a 90-day appeal and comment period Aug. 20 for proposed federal flood map updates in Volusia and other counties" (county announcement, August 2026)
- WFTV, August 2026 — Volusia County residents have 90 days to appeal new federal flood maps (county accepts unincorporated-area submissions only; appeals require technical or scientific data)
- 44 CFR Part 67 — the 90-day appeal period runs from the second publication of the notice in a local newspaper, not from the Federal Register date
This page is educational information from a licensed real estate professional, not insurance, legal, or engineering advice. Flood zone determinations are made by FEMA and administered by the City of Ormond Beach or Volusia County (unincorporated areas). Verify any property's current and preliminary flood zone with the official sources above before making decisions. Simply Real Estate is an Equal Housing Opportunity broker.